Teams are making significant strides at NEORSD’s Westerly Chemically Enhanced High-Rate Treatment (CEHRT) project along the Lake Erie shore in Cleveland. The important project aids in adding capacity at the plant, which in turn will help prevent overflows into the lake.

Milestones include:

  • All structural concrete — about 25,000 cubic yards — is complete.

  • All process equipment and pumps have been installed. This includes 16 tanks of chain and flight; 42 stainless-steel slide gates; 2 drain pumps; 3 NPW pumps.

  • All chemical systems and equipment have been installed, including polymer mixers, blending units and diffusers; chemical rapid induction mixers, and storage tanks; and about 28,000 linear feet of PVC and CPVC piping.


Our teams are currently going through testing phases at the plant, which serves more than 107,000 residents.

Related News

Medina, OH Veterans Affairs Groundbreaking

Groundbreaking for Medina VA Outpatient Clinic

OnMain Progress - June 2026

Work is Moving Forward at Think Dayton Building

Hattie Larlham Finished Interior

Completion of the Ventilator Program Addition at Hattie Larlham

A light gray geometric hexagon pattern with interlocking lines, forming an abstract and minimalist design on a white background.

Interested in Shook?

Secret Link