WHEELING WATER TREATMENT PLANT EXPANSION

Water Resources

WHEELING WATER TREATMENT PLANT EXPANSION

This project renovated the existing Raw Water and High Service Pump Bldg with a new electrical service and switchgear. Existing pumps and motors were changed from 4160v to 480v service with VFD Control. The pump building had all of its windows replaced, new interior paint, and masonry restoration performed. The existing high service pumps were abandoned. The Settling Basins underwent an extensive renovation that included the rectangular sludge collection equipment, flocculators, concrete repair, baffle walls, platform and handrail replacement, electrical service, and instrumentation.
Client City of Wheeling
Location Wheeling, WV
Square Footage
Project Budget $30.5 Million
UNIVERSITY OF DAYTON CENTER FOR LEADERSHIP

Education

UNIVERSITY OF DAYTON CENTER FOR LEADERSHIP RELOCATION

This project consisted of a 13,500 SF renovation of University of Dayton’s Center for Leadership. The project included the renovation of 3 large classrooms, 4 conference rooms, Collaboration room, Reception, Kitchen & Lactation room.
Client University of Dayton
Location Dayton, OH
Square Footage 13,500.00
Project Budget $767,000
UNIVERSITY OF CINCINNATI CENTRAL UTILITY PLANT

Industrial

UNIVERSITY OF CINCINNATI CENTRAL UTILITY PLANT

This project consisted of a 28,000 SF addition/renovation to an existing power plant. The plant had to remain operational throughout the project in order to supply power to the nearly 40,000 students, faculty, and staff that relied on it for their homes and offices.
Client University of Cincinnati
Location Cincinnati, OH
Square Footage 28,000.00
Project Budget $84 Million
REID HEALTH MEDICAL OFFICE BUILDING

Healthcare

REID HEALTH MEDICAL OFFICE BUILDING

The $8.7 million Greenville Medical Office Building is a new facility constructed on a greenfield in Greenville, Ohio. The 33,000 SF building was constructed in 11 months and includes cardiology, ENT, neurology and a general practice area. The project also involved new sitework and running new utilities to the building.
Client Reid Health
Location Greenville, OH
Square Footage 33,000.00
Project Budget $8.7 Million
THE OHIO STATE EAST REGIONAL CHILLED WATER PLANT

Industrial

THE OHIO STATE EAST REGIONAL CHILLED WATER PLANT

One of the first public Construction Manager at Risk projects in the State of Ohio, this project involves construction of a new chilled water plant located within the Academic Core North (ACN) area of campus. The ultimate capacity of the facility will provide approximately 15,000 tons of chilled water capacity and satisfy “N+1” redundancy for standby chiller requirements.
Client The Ohio State University
Location Columbus, OH
Square Footage 26,000.00
Project Budget
LAWRENCE COUNTY UNION ROME WASTEWATER TREATMENT PLANT

Water Resources

LAWRENCE COUNTY UNION ROME WASTEWATER TREATMENT PLANT

The renovations converted the plant to new technology using a submerged plate Membrane BioReactive system. In addition to the MBR system with sludge thickening capabilities, there is also a new headwork’s structure with new automatic bar screens, grit removal, a septage receiving station and an odor control system all married together under one structure.
Client Lawrence County
Location Chesapeake, OH
MGD 6.00
Project Budget $23 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon