HIGH OAKS LTD. Q-LAB WAREHOUSE ADDITION

Industrial

HIGH OAKS LTD. Q-LAB WAREHOUSE ADDITION

This addition allowed Q-Lab to expand their production operation and improve their delivery and product flow processes. The project also included new air-conditioning of existing spaces and installation of a fire pump system to feed the addition and a portion of the existing facility.
Client Q-Lab/High Oaks Limited
Location Westlake, OH
Square Footage 13,000.00
Project Budget $3 Million
ELYRIA PUBLIC LIBRARY - SOUTH BRANCH

Other

ELYRIA PUBLIC LIBRARY - SOUTH BRANCH

The renovation of the South Branch was part of a 4-library improvement and new construction project for the Elyria Public Library System. Specifics for the South Branch included new painting, carpeting, lighting, HVAC upgrades, new group study rooms, updated landscaping and numerous technology upgrades (security, projectors, TVs, computers, book sorter).
Client Elyria, OH
Location Elyria, OH
Square Footage 8,443.00
Project Budget $1.74 Million
STERLING COMMERCE DATA CENTER

Technology

STERLING COMMERCE DATA CENTER

The project involved the infrastructure of the building’s fourth floor, rerouting all wiring and conduit to the buildings first floor, crossing through the building’s main lobby in the process. The Tier IV classification of the data center called for multiple active power and cooling distribution paths, redundant components, and is considered fault tolerant with over 99.995% site availability.
Client Sterling Commerce
Location Columbus, OH
Square Footage 20,000.00
Project Budget $5.9 Million
CASE WESTERN RESERVE UNIVERSITY KELVIN SMITH LIBRARY AND CRAWFORD HALL DATA CENTER

Technology

CASE WESTERN RESERVE UNIVERSITY KELVIN SMITH LIBRARY AND CRAWFORD HALL DATA CENTER

This project involved the simultaneous renovation of two existing data centers on Case Western Reserve’s campus. Kelvin Smith work included demolition of an existing mail room and conversion to raised floor space containing a segregated high performance data cluster. In addition, we ran mechanical and electrical systems up a nearby chase to connect new mechanical equipment installed on the roof. The Crawford Hall Data Center involved a new fire suppression system and replacement of a generator.
Client Case Western Reserve University
Location Cleveland, OH
Square Footage 5,000.00
Project Budget $3.2 Million
BRIDGESTONE AMERICAS AKRON DATA CENTER UPGRADE

Technology

BRIDGESTONE AMERICAS AKRON DATA CENTER UPGRADE

This project involved the complete remodel of the office building and corporate data center. Specific scope items include: » new N+2 electrical service » new cooling for data space » significant architectural upgrades » new preaction fire suppression system » new generator yard » administration office space remodel
Client Bridgestone
Location Akron, OH
Square Footage 84,000.00
Project Budget $9.5 Million
JP MORGAN CHASE MAIN EQUIPMENT ROOM RENO

Technology

JP MORGAN CHASE MAIN EQUIPMENT ROOM RENO

This project involved converting an existing office cubicle farm into the main equipment room. New spaces include a new main equipment room, vendor area, staging room, fire alarm/sprinkler room, electrical room, UPS system A & B rooms, an alcove/ramp entrance area, new building automation system for MER rooms, new double interlock pre-action fire suppression system and a state-of-the-art fire alarm system.
Client JP Morgan Chase
Location Columbus, OH
Square Footage 3,379.00
Project Budget $5 Million

SAFETY

SAFELY, THE ONLY WAY TO WORK

Safety is the most important value in our company. It impacts everything we do and is the first consideration when we plan our work. Our motto says it all: Safely, the only way to work. Our entire team is passionate about ensuring that everyone onsite works safely and can return home at night.

Our award-winning safety program is designed to provide zero incidents, as well as a safe and healthy work environment for all of our employees, subcontractors and the general public. Our goal on every job is to ensure that all work is completed safely with appropriate tools, equipment and methods. This goal takes priority over project scheduling concerns.

Safety Icon