September 24, 2025 News
Work is moving ahead at full speed at the Wastewater Treatment Plant improvement project in Siler City, NC.
Structural concrete is 60% complete on this $62 million project for which Shook is serving as General Contractor. To date, teams also have:
The work continues. Coming up:
Several municipalities and entities — Siler City, City of Sanford, NC, and TriRiver Water — are collaborating on this transformative project, which will increase water capacity for the growing region. The project is expected to be complete in 2027.
Proud Sponsor of Drink Local. Drink Tap.'s 4 Miles 4 Water
June 27, 2023Mission
Shook Named Top Workplace in Cleveland 2023
June 26, 2023Awards
Sierra Nevada Corporation's Second Dayton Facility Set for Construction Soon
June 24, 2023News
Greene County NW Regional WTP: Critical Integrity Review
June 22, 2023News
Shook and Kendall Electric Volunteer with Habitat for Humanity of Greater Dayton
June 21, 2023Mission
Maumee Valley Habitat for Humanity - Playhouse Project Blitz Build
June 16, 2023Mission
14th Annual CJ Summer STEMM Camp
June 15, 2023Mission
Dayton Metro Library Celebrates Huber Heights Branch Grand Opening
June 8, 2023News
Generation Dayton Day - Volunteering at Dayton Children's Hospital
June 7, 2023Mission
Group Site Visit to Dayton Public Schools' Welcome Stadium Project
June 6, 2023News
Volunteering at St. Vincent de Paul - Dayton, OH
June 2, 2023Mission
Take a Sneak Peek inside Dayton Metro Library's newest branch
May 31, 2023News