June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. Shook phased the construction of this project to prioritize the plant’s operations in the existing building.
Randall Beck named ENR Midwest 2023 Top Young Professional
January 27, 2023Awards
Mentoring Dayton's Youth: Volunteering with Victory Project
January 26, 2023Mission
Grand Opening of Dayton Metro Library's Northmont Branch
January 23, 2023News
Distributing Coats and Blankets in Chicago
January 18, 2023Mission
Reid Health's New Connersville Facility Breaks Ground
January 17, 2023News
Introducing Careers in Construction at the Polaris Career Center
January 16, 2023Mission
Progress Update on Salem Regional Medical Center's Columbiana Facility
January 13, 2023News
Providing Support to Vittles for Vets
January 12, 2023Mission
Collecting Winter Supplies for Dayton Public Schools' Thurgood Marshall HS
January 11, 2023Mission
Flythrough of Lexington Local Schools' New 7-12 Building
January 10, 2023News
Shook Releases Trailer of Documentary: Obrigado Mucombeze
January 5, 2023Mission