April 21, 2025 News
We're excited to share the progress on NEORSD's Westerly Chemically Enhanced High-Rate Treatment (CEHRT) project. To date, we've finished 20,500 cubic yards of concrete! Check out some of the recent updates on each segment of the project below.
💧 New High-Rate Disinfection (HRD) Tank: All concrete associated with the new HRD Tank has been completed and the installation of process equipment located in the tank has begun.
💧 Control Building: Roofing and exterior insulated metal wall panels have been completed and the process equipment installation within the building is ongoing.
💧 Existing Combined Storm Overflow Treatment Facility (CSOTF): Process equipment installation is wrapping up within these tanks.
Randall Beck named ENR Midwest 2023 Top Young Professional
January 27, 2023Awards
Mentoring Dayton's Youth: Volunteering with Victory Project
January 26, 2023Mission
Grand Opening of Dayton Metro Library's Northmont Branch
January 23, 2023News
Distributing Coats and Blankets in Chicago
January 18, 2023Mission
Reid Health's New Connersville Facility Breaks Ground
January 17, 2023News
Introducing Careers in Construction at the Polaris Career Center
January 16, 2023Mission
Progress Update on Salem Regional Medical Center's Columbiana Facility
January 13, 2023News
Providing Support to Vittles for Vets
January 12, 2023Mission
Collecting Winter Supplies for Dayton Public Schools' Thurgood Marshall HS
January 11, 2023Mission
Flythrough of Lexington Local Schools' New 7-12 Building
January 10, 2023News
Shook Releases Trailer of Documentary: Obrigado Mucombeze
January 5, 2023Mission