July 23, 2025 News
We are excited to announce the completion of the Neuse River RRF Sidestream Treatment project for the City of Raleigh, North Carolina! Shook delivered this Bid Package in collaboration with Crowder as the CM at Risk. The facilities were necessary to provide sidestream deammonification treatment as part of the overall Bioenergy Recovery Project.
Project features included:
๐๏ธ Construction of a new 130' X 60' cast-in-place concrete treatment basin with equalization tanks, which houses the diffused aeration equipment, screening equipment, sludge collection equipment, and vertical shaft mixers.
๐๏ธ A new service building to house the RAS pumps, blowers, and electrical gear.
๐๏ธ Installation of a filtrate pump station.
๐๏ธ A new 25โ diameter IFAS clarifier.
๐๏ธ Site improvements, exposed and underground process piping, and electrical/SCADA upgrades.
We are proud to be a part of updating the region's infrastructure to support its continued growth!
OSBA Capital Conference and Tradeshow
November 14, 2023News
Tune into the CEA Podcast Hear from Shook Leadership
November 14, 2023Insights
Introducing Careers in Construction in Princeton, NC
November 6, 2023Mission
Q3 2023 Craft Safety Awards
November 2, 2023News
Chaminade Julienne Expands Campus Footprint
November 1, 2023News
North Carolina One Water Annual Conference
October 31, 2023News
The Shook Foundation distributes $28k in its third grant cycle
October 26, 2023Mission
Leadership: Why it Matters More Than Ever
October 25, 2023Insights
Hear from our Central Region Teammates
October 24, 2023News
Learn About Shook's Industrial Market
October 18, 2023News
Building a ramp with Servants At Work, Inc.
October 12, 2023Mission
Engineers Without Borders Volleyball Tournament
October 11, 2023Mission