June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. Shook phased the construction of this project to prioritize the plant’s operations in the existing building.
Shook Construction undertakes new operating model to grow work
December 12, 2023News
Dayton Metro Library Career Adventures Day
December 6, 2023Mission
Supporting Cleveland State University's Construction Management Program
November 30, 2023News
Congratulations to our Happy Shooksgiving Winner: Nine13sports
November 28, 2023Mission
Shook Wins Auman Award for Excellence in Safety
November 21, 2023Awards
Shook Wins Build Ohio Award for Sierra Nevada Corporation Hangar
November 17, 2023Awards
Happy Shooksgiving! It's time to vote!
November 16, 2023Mission
West Carrollton Schools Phase II Building Project Groundbreaking
November 15, 2023News
OSBA Capital Conference and Tradeshow
November 14, 2023News
Tune into the CEA Podcast Hear from Shook Leadership
November 14, 2023Insights
Introducing Careers in Construction in Princeton, NC
November 6, 2023Mission
Q3 2023 Craft Safety Awards
November 2, 2023News