June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. Shook phased the construction of this project to prioritize the plant’s operations in the existing building.
Thailand Mission Trip: Ready for Takeoff!
February 13, 2024Mission
West Carrollton Unveils Major School Projects
January 29, 2024News
Announcing our 2024 Mission Trip Partner
January 22, 2024Mission
Distributing Gift Bags to Mercy Health Patients
January 18, 2024Mission
Congratulations to our Innovation Group on their new certifications!
January 16, 2024News
Perry Helping Perry Bike Drive
January 15, 2024Mission
Happy Holidays from Shook Construction!
December 21, 2023News
Shook Construction undertakes new operating model to grow work
December 12, 2023News
Dayton Metro Library Career Adventures Day
December 6, 2023Mission
Supporting Cleveland State University's Construction Management Program
November 30, 2023News
Congratulations to our Happy Shooksgiving Winner: Nine13sports
November 28, 2023Mission
Shook Wins Auman Award for Excellence in Safety
November 21, 2023Awards