June 28, 2023 News
Work has largely wrapped up at the City of Dayton’s Total Phosphorus Treatment Project!
The project was designed to facilitate NPDES Nutrient Removal Compliance with the addition of a new Chemical Feed System to be piped to the existing aeration process. This new system includes 7 ea Chemical Bulk Storage Tanks, associated pumps and piping and new chemical delivery infrastructure. Due to additional solids processing needs and the age of the current Diffused Air Floatation (DAF) Tanks, the project scope was also designed to include removal and replacement of the 4 ea DAF Tanks with 4 ea Rotary Drum Thickeners, an associated Polymer System and new Thickened Waste Activated Sludge Pumps. Shook phased the construction of this project to prioritize the plant’s operations in the existing building.
Sierra Nevada Corporation celebrates opening of 2nd hangar in Dayton, announces hangars 3 & 4
October 3, 2024News
Portage Lakes Career Center Celebrates Opening of New Dental & Welding Labs
October 2, 2024News
Celebrating together at our Fall Picnics
September 26, 2024News
Third Annual Shook Foundation Invitational - Dayton
September 25, 2024Mission
Dayton Regional STEM Schools K-5 Elementary Groundbreaking
September 24, 2024News
The Shook Foundation distributes $38k in its fourth grant cycle
September 23, 2024Mission
I Build America - Ohio features Shook Laborer, Mike Brey
September 20, 2024News
Volunteering at the Licking River Round Up
September 20, 2024Mission
I Build America - Ohio features Shook's Caleb Arnold
September 19, 2024News
Shook Celebrates Award Wins at 2024 Cogence Alliance Town Hall
September 18, 2024Awards
Project Spotlight: Robin Industries
September 17, 2024News
Shook raises awareness on Suicide Prevention
September 16, 2024News