The demolition and abatement consisted of 15 spaces, where the renovation boasts 9 new classrooms, 2 teacher prep spaces and a large STEMM lab. The design is energy efficient with sloped ceilings and specific lighting. Recycling was managed throughout the project, especially during demolition.