LAKE SWAMP WWTP UPGRADE

Project:  Lake Swamp WWTP Upgrade

               Lake City, SC

 

Bid Due:  July 29, 2021 at 2:00 PM

              **Please send scope/quotes no later than 10:00 AM to allow for proper analysis**

 

Contact:  estimating@shookconstruction.com

 

Project Notes:

The work consists of demolition of basins and aerobic digester, including removal and disposal of solid & liquid waste; rehabilitation of clarifier equipment for Clarifier Nos. 1, 2 & 3; replacement of dry pit RAS pumps, submersible sump pumps and blower; refurbishment of belt press; construction of a new septage receiving station, new aeriation basin, new blower building, new generator and automatic transfer switch, new transfer switch for effluent pump generator, and associated civil, electrical and HVAC work.  Sales tax is to be included when submitting a quote.  Davis-Bacon prevailing wage requirements apply.

 

Scope Items Include: General Conditions, Demolition, Sludge Removal, Fencing, Dewatering, Earthwork & Backfill, Aggregate Supply, Hauling, Erosion Control, Termite Control, Seeding & Mulching, Paving, Formwork, Ready Mix, Reinforcing Steel, Precast Concrete Wetwell, Precast Hollowcore, Masonry, Metal Fabrications, Railings, Gratings/Stairs, Single-Ply Membrane Roofing, Caulking & Joint Sealants, Aluminum Rolling Service Door, Doors/Frames/Hardware, Floor Hatches, Aluminum Windows, Paint & Coatings, Signage, Fire Extinguishers & Cabinets, Aluminum Man Door Canopy, Pumps, Treatment Plant Equipment, Instrumentation & Controls, Process Piping/Valves, HVAC, Standby Generator and Electrical.

 

Bid documents can be downloaded from the link below.