The work for Nelson County Service Authority includes the furnishing of the labor, materials and equipment and the construction of the following: Replacement of the existing metal package plants (three separate trains) and metal aerobic digesters with a new membrane bioreactor system (two trains) and two aerobic digesters; new coarse screen building, new fine screen building, new ultraviolet disinfection system, new non- potable water system, miscellaneous manhole and tankage modifications; appurtenant piping, site work, utilities and facilities. The membrane bioreactor system has pre-selected.

The project is tax exempt.  Davis Bacon Prevailing Wage rates apply.

The following items of work apply to this project:  

Scope Items: Surveying, Aggregates; Bypass Pumping; Dewatering; Concrete Repair, Coring, Sawing; Deep Foundations; Demo; Drilling, Blasting; Erosion Control; Hazardous Waste Disposal; Land Clearing; Landscaping; Paving; Precast Structures; Sheet Piling; Sitework; Trucking; Concrete and Accessories; Formwork; Masonry; Hatches; Misc. Metals; Railings; Steel Trusses; FRP; Firestopping; Insulation; Roofing; Waterproofing; Doors and Windows; Overhead Coiling Doors; Acoustic Ceiling; Epoxy Flooring; Painting; Fire Extinguishers; Louvers; Signage; Treatment Plant Equipment; Instrumentation and Controls; Conveyance Systems; HVAC; Plumbing; Pipe Supports; Pipes & Valves; Electrical; Generators