Mebane Water Resource Recovery Facility Improvements

$5,600,000 - Bids 7/6/2021

Project:                Mebane Water Resource Recovery Facility Improvements

                             Mebane, NC

Bid Due:               July 6, 2021 at 10:00 AM

                             **Please send scope/quotes no later than 5:00 PM 7/5/21 to allow for proper analysis**

Contact:               estimating@shookconstruction.com

Project Notes:

The work under this project consists of the following major work items in the 2.5 MGD WRRF: New headworks facility with one mechanical screen, grit chamber, grit pump, grit cyclone and classifier. One rotating drum thickener (RDT) located in existing solids building. One polymer system for use with the new RDT. Sludge aerobic digesters modifications for two mixers in each digester. Three blowers for aeration of both tanks. Bid proposal should be based on the Inovair Blowers detailed proposal as specified in Section 44 42 19.06, Aeration Blower System (Preselected). Modification to three secondary clarifiers consisting of new Stamford effluent baffles, and energy dissipating inlets for each clarifier. Influent flowmeter monitoring flow from the headworks in a vault. Architectural for a new electrical building and patching for the thickener building.

Scope Items Include: General Conditions, Surveying, Photography, Landscaping, Trucking, Sitework, Erosion Control, Bypass Pumping, Pipes & Valves, Equipment, Demolition, Electrical, Concrete Repair, Concrete Formwork, Concrete Accessories, Cast-in-Place Concrete, Concrete Mix, Precast Structures, Reinforced Steel, Painting and Coatings, Misc. Metals, FRP, Aluminum Railings, Fire Extinguishers, HVAC, Aggregate, Pipe Support and Instrumentation and Controls.

Bid documents can be downloaded from the link below.

https://shook.filegenius.com/downloadPublic/tt9dkqqeezkog6r/ro8g4ps1yuf2aya

To apply for this job email your details to lreitano@shookconstruction.com

2021-06-11T12:46:16-04:00June 11th, 2021|Comments Off on Mebane Water Resource Recovery Facility Improvements