Project Notes:

The Project consists of installation of a new Summit County Metering Chamber; construction of a Plant Effluent Metering Chamber; repair of Grit Collection, Primary Clarifier, Intermediate Clarifier, and Final Clarifier Equipment; installation of Sludge Tank Mixers, a Sludge Dewatering Press, and new Conveyor Belts; structural improvements to the Sludge Dewatering Building; installation of Vent Screens at Trickling Filters; repairs and/or replacement of miscellaneous Gates; improvements to Covered Sludge Storage Pad; rehabilitation of existing Bio-Filter System; and electrical and SCADA upgrades.  Project is tax exempt and Davis-Bacon prevailing wage rates apply.

Scope Items Include:

General Conditions, Demolition, Asbestos Abatement, Hauling, Ready Mix Supply, Reinforcing Steel, Masonry, Structural Steel, Aluminum Handrails/Grating, Caulking & Joint Sealants, Aluminum Windows, Door Hardware, Paint & Coatings, PLAM Windowsills, Plumbing, HVAC, Electrical, Excavation & Backfill, Sand & Gravel Supply, Erosion Control, Paving, Seeding, Site Utilities, Process Piping/Valves/Gates, Belt Conveyor System and Treatment Plant Equipment.

Quotes submitted must include your Tax ID & DUNS numbers to be able to complete bid form requirements. 

Bid documents can be downloaded from the link below.

Barberton WWTP Improvements Phases 3B and 3C – Barberton, OH:
https://shook.filegenius.com/downloadPublic/zngrc9pm7ouu1pu

To apply for this job email your details to jtrittschuh@shookconstruction.com

2021-05-03T14:31:22-04:00April 26th, 2021|Comments Off on Barberton WWTP Improvements – Phases 3B and 3C