Columbus, IN WWTP

This project consists of the construction of a new lift station to prepare for a waste water treatment plant to be constructed in the future. The scope of work includes two 4,200 GPM pumps, six 36,000 GPM submersible pumps and a 6,800 SF structure, holding two water screens each with the capacity to process 120 MGD. The project includes odor control facilities, extensive de-watering and sitework, a chemical feed system and the laying of a reinforced concrete pipe, varying between 36 inches and 108 inches in size.
 